Bathroom renovation checklist

Tampa Bathroom RemodelingBathroom renovation is often overwhelming for a typical Tampa family. You need to decide how much you can comfortably spend, select the best products and figure out if you will be modifying the layout.

All of this happens before you call a contractor like the specialists from Rossi Construction.

To guarantee that your bathroom renovation project keeps on schedule, here is a checklist you can keep. Always remember: A successful Florida renovation project is all about the timing.

Six months before the renovation

Now is the best time for inspiration!

Determine what you want your updated Tampa bathroom to look like, rip pages out of magazines and bookmark samples so you can build either a scrapbook or a Pinterest inspiration board. Be sure to make notes about what you like in each bathroom design. As the list of compiled samples grows, flip through the photos and find the similarities and see what is out there by way of fixtures and flooring that are a good match.

Talk to a specialist from Rossi Construction.

While it is not necessary to talk to a contractor this early, it is the ideal time to open communications and get an idea as to their upcoming schedule.

Sketch your preferred bathroom layout.

It is important to plan your bathroom layout early. Think about what works and what does not work in your current bathroom layout, because a lot of St. Petersburg homes were built when families had a smaller list of “must have” features.

Do you want to move the shower or toilet, and if you do, is this practical? It is important to understand that the toilet is the most expensive thing to move in the bathroom while a shower with multiple sprayers will typically require additional rough plumbing work. Both plumbing situations will equate to more money spent.

Three months before the renovation

Finalize the project budget.

After figuring out what you can comfortably spend to remodel the bathroom, look at the number again and understand that roughly 2/3 of the money will be spent on qualified labor. If it feels like the remaining budget is too small, do not worry: Thanks to an array of flooring and fittings options, you can replicate a pricey look for less.

Call Rossi Construction to schedule an in-person meeting.

With just ninety days before the demolition, now is the time to call 813-436-0177 to schedule an appointment to meet with our team. Ask all of the questions that will be plaguing you as the demolition approaches:

  • How much will I pay at the beginning of the project?
  • How long will I be without a shower during a Tampa summer?

Two months before the renovation

Purchase all required fixtures and tiles.

Always play it safe by ordering your preferred tiles and fixtures 6 – 8 weeks before your scheduled bathroom demolition date.

One month before the renovation

Prepare for the arrival of the Rossi Construction team.

Clean the cabinets, medicine cabinet and all additional storage space. Take some time to establish a temporary preparation space where you will be able to get ready for work out of the sight of our team.

During the renovation

Try to remain patient.

If a project is delayed by a couple of days, do not get overly frustrated. If a two day delay is the only problem you experience in the entire renovation process, things are good!